ian@ianclarkrestoration.com

St Cross Mill

Sluice gate design, manufacture/restoration and site installation 
Client - Private 
Working in close partnership with the client, main contractors, environmental agencies and wildlife partners ICR were commissioned to undertake a comprehensive engineering package of works to supply and install a series of traditionally designed sluice gates within a highly sensitive protected river landscape

The project utilised traditional form and function together with conservation best practice to provide a sensitive blend of architectural design and engineering function to enable safe and efficient river flow and wildlife management

The project included foundry pattern-making, castings manufactured in SG iron, component machining, application of protective coatings and full site installation and commissioning  

sluice gate

sluice gate

sluice gate

Copyright © 2024 Ian Clark Restoration  |  All Rights Reserved
Ian Clark Restoration
1 Railway Cottages
Old Station Road
Itchen Abbas
Winchester
Hampshire
SO21 1BA
UK

t: +44(0)1962 779495
m: +44(0)7836 536932
e: ian@ianclarkrestoration.com
www.ianclarkrestoration.com